Installing the water pump
Fuel tankIgnition circuit cut-off system
The ignition circuit cut-off system (comprising
the sidestand switch, clutch
switch and neutral switch) has the following
functions.
It prevents starting when the transmission
is in gear and the sidestand
is up, but the clutch lever is
not pulled.
It prevents starting when the t ...
Checking the cylinder and piston
1. Check:
Piston wall
Cylinder wall
Vertical scratches Replace the
cylinder,
and replace the piston and piston rings as a
set.
2. Measure:
Piston-to-cylinder clearance
a. Measure cylinder bore "C" with the cylinder
bore gauge.
NOTE:
Measure cylinder bore "C" by takin ...
Installing the swingarm
1. Lubricate:
Bearings
Spacers
Dust covers
Pivot shaft
2. Install:
Bearings "1"
2. Swingarm
A. Left side
B. Right side
3. Install:
Swingarm adjusting collar "1"
Swingarm "2"
Pivot shaft
Pivot shaft nut "3"
a. Install, and then fully turn in the swingarm adju ...